Overview
3ctest SEPN, SPN and EFTN series is a new generation of automatic three-phase five-wire coupling/decoupling network combined with lightening surge and burst pulse. It can be used for DUT AC/DC mains. It can be equipped with CCS600, CWS 600 and EFT 500 simulators, and also be customized as per customer needs.
General Data | |
Working mains | AC110V/220V, ±10%, 50/60Hz?default AC220V? |
External control | 25Pin D-Bus |
Working indicator | LED front panel |
Detection output | 1 meter standard coaxial cable |
Dimension | 19 inch/6U |
Weight | approx. 50Kg |
Temperature | 15–35°C |
Humidity | 45%–75% |
Air pressure | 86kPa–106kPa |
Surge immunity test as per IEC 61000-4-5 | |
Standard | IEC/EN 61000-4-5?GB/T 17626.5 |
Test voltage | 0.3kV–6kV?±10% |
Test current | 0.15kA–3kA?±10% |
Current waveform | Front time: 8us±20%, time to half value: 20us±20% |
Source output impedance | 2 ohm |
Output polarity | +/-/alternative |
Coupling capacitance | 9uF, 18uF |
Coupling resistance | 10 ohm, 0 ohm, IEC standard mode or customized mode |
Synchronization | 0° - 360°, 1° step or random |
Coupling network | Three-phase automatic CDN |
EFT/Burst test as per IEC 61000-4-4 | |
Standard | IEC/EN 61000-4-4, GB/T 17626.4 |
Test voltage | 0.25 kV -4.8kV, ± 10% |
Polarity | +/- |
Pulse frequency | 0.1kHz–1000kHz |
Synchronization | 0° - 360°, 1° step or random |
Coupling network | Three-phase automatic CDN |
Optional Accessories | |
1. SEPN series | CDN for surge and burst |
SEPN 2216S | Single phase three-wire AC 220V 16A Max 250V |
SEPN 2232S | Single phase three-wire AC 220V 32A Max 250V |
SEPN 3816T | Three-phase five-wire AC 380V 16A Max 440V |
SEPN 3832T | Three-phase five-wire AC 380V 32A Max 440V |
SEPN 6932T | Three-phase five-wire AC 690V 32A Max 750V |
2. SPN series | CDN for lightening surge |
SPN 3816T | Three-phase five-wire AC 380V 16A Max 440V |
SPN 2232S | Single phase three-wire AC 220V 32A Max 250V |
3. EFTN series | CDN for burst |
EFTN 3832T | Three-phase five-wire AC 380V 32A Max 440V |
4. CCC 100 | Capacitance coupling clamp |
5. EMS Lab | Test software |
Basic Equipment | |
1. SEPN, SPN, EFTN test system | 6. Coaxial cable |
2. Three-core power cord | 7. Four-core plug |
3. Test cable | 8. Four-core socket |
4. Ground wire | 9. Factory test report |
5. Fuse | 10. User manual |